Faktum Ltd. steel constructor has been selected for the opaque Allwater Panel assembly. Roof, wall and Floor panels will be constructed and assembled on site in the next 4 weeks. The sturcture for the pavilion will be made by steel, but additional panels by aluminum and fibre-reinforced plastic are also planned for the CE approval process.