All details have been discussed and finalized with Faktum Ltd. the steel manufacturer of the opaque Allwater Panels.
Model has been used to present the pavilion structure and the assembly process. The pavilion will be built with prefabricated load-bearing panel structure. All elements will be prefabricated in the factory and cannot be changed later, therefore detailed discussion on the structure was important and necessary.
On the meeting Milan Berényi (manager) and Matyas Gutai PhD (architect, innovator) from Allwater Ltd. also Béla Szepesi from Faktum Ltd were present.