Blog / All news about Projects and Research

Building of Allwater Pavilion part 3: Panel assembly in Faktum

Building of Allwater Pavilion part 3: Panel assembly in Faktum

Allwater Panels come to the site prefabricated, on site only the assembly takes place. The elements for the pavilion are about 1 x 2.4 meters. The opaque units are made by Faktum Ltd. in Debrecen city. Allwater opaque panels can be made with various materials, the technology is ideal for both steel and aluminum. The [...]

Continue Reading —›
Building of Allwater Pavilion part 2: Containers arrived

Building of Allwater Pavilion part 2: Containers arrived

Allwater Pavilion’s purpose is not only to present this technology in real scale: the goal is also to test the special “heat-trap” system for the Panel we developed. The pavilon works as a heat battery during cooling periods and the structure absorbs the heat on perimeter and also indoors. This heat energy will be stored [...]

Continue Reading —›

 

Building of Allwater Pavilion part 1.: Joint elements at Borela

Our blog opens a new chapter, where we give some detail about the construction of Allwater Pavilion. The joint elements have been finished first of course. The units have been designed together with Stromwerk Ltd. and produced by Borela Ltd. close to Kecskemet. This was one of the main challenge for us because the elements [...]

Continue Reading —›